Contractor submission — never counted as independent verification

Your submission is labelled as yours. The independent repair quality figure comes only from resident checks.

Site photographs

Submit before-and-after photographs from your repair. Everything will be labelled as contractor-provided and linked to the original report.

Submission must link to a real report. If you don't have the ID, find it at potholepatrol.co.uk/reports by address.

Four rules for contractor submissions

Labelled. Your submission is named as yours on every surface it appears.

Tied to a real report. It links to a report with a location and a date.

Independent figures. Your photographs appear in the record. The repair quality figure comes only from resident checks.

Council named alongside. The authority that commissioned the work is named alongside your company.